Ridges, hips and verges
Rebedded or converted to a dry-fix system, depending on the tile and what suits the roof.
Sometimes a roof is not finished, just tired. The ridge needs rebedding, a couple of flashings are going, the verges are loose and a roof window leaks. Doing it all in one visit, with one scaffold, usually costs less than three separate call-outs.
If you recognise two or three of these, it is worth talking about it as one job.
We look at the whole roof first, then decide what needs doing and in what order.
Rebedded or converted to a dry-fix system, depending on the tile and what suits the roof.
Old mastic repairs cut out and replaced with proper lead or valley linings.
Flashing kits renewed, and fascias, soffits and gutters sorted while the scaffold is up.
Your quote splits what needs doing now from what could wait a few years. You pick. We are not going to pad the job out.
Often a lot cheaper, if the tiles and the felt underneath are still sound. If they are not, renovation just delays the inevitable and we will tell you.
A mechanical system for fixing ridge and verge tiles instead of mortar. It does not wash out, so it needs far less upkeep. It is not right for every roof, and we will say if it is not.
Yes, and it makes sense to, because the scaffold is already there.
Yes. That is exactly why we split the quote into now and later.