Strip and check
Old covering off in sections, so the house is never left open to the weather, and the timbers checked as we go.
A new roof is mostly the stuff you never see again: the membrane, the battens, the flashings, the way the roof windows are sealed in. Get those right and the tiles on top will last decades.
Age on its own does not mean you need a new roof. These do.
How the roof is built underneath matters more than the colour of the tile.
Old covering off in sections, so the house is never left open to the weather, and the timbers checked as we go.
Breathable membrane, new treated battens at the right gauge for the tile, and proper ventilation.
Laid, fixed and finished at the ridge, verges and valleys. Roof windows flashed in with the right kit.
Our project page follows one of our re-roofs from the old tiles coming off to the last slate going on. Have a look before you get quotes. It will tell you what to ask everyone else.
It comes down to the size and shape of the roof, the tile or slate you choose, scaffolding, and what we find once the old covering is off. We price each roof after seeing it and put everything in writing, including what happens if we find rotten timber.
Depends on how widespread the damage is and what the felt and battens are like. We will look in the loft as well as on the roof and tell you straight.
Usually, yes, but it depends on the pitch, the weight the roof can take and, in some streets, what the council will allow. We will go through the options with you.
An average semi is often a week or two, but weather, scaffolding and what we find under the old tiles all affect it. You get a proper timeline with the quote.
Yes. The Our Work page has fourteen photos of a full re-roof, from the old tiles to the finished slate.
We are in Hayes, UB3 5EL. The closer you are, the quicker we can get to you. Ring with the postcode and you will get a straight answer.
All areas we cover